Archive:

CFL Group
// 29 September 2021

Open days at the CFL. A look behind the scenes into the everyday life of our employees, who play an important role for smooth railway traffic, but who mostly work in the background. This year’s open days took place in the context of our 75th birthday and allowed for visitors to discover the 15.000m2 Atelier…

More
engineering works/projects
// 22 September 2021

To ensure that customers can travel comfortably and safely by train, the CFL works non-stop on the maintenance and repair of Luxembourg’s rail network. Heavy machinery is used to help the CFL employees with this work. In a series of blog articles, we will give you an insight into the world of these strong and…

More
engineering works/projects
// 15 September 2021

Many car drivers have already noticed the construction work close to the A3, just past the Aire de Berchem in direction Luxembourg. It is not uncommon for cars to slow down, much to the displeasure of the cars behind them, in order to get a glimpse on the metallic construction, which will become one of…

More
engineering works/projects
// 8 September 2021

So that the trains in Mersch can run even more punctually and it is possible to be more flexible in case of disruptions, work is currently being carried out in Mersch. This also includes the installation of 8 new switches at this station, an important requirement for a better connection of the 3 existing tracks…

More
engineering works/projects
// 1 September 2021

To ensure that customers can travel comfortably and safely by train, the CFL works non-stop on the maintenance and repair of Luxembourg’s rail network. Heavy machinery is used to help the CFL employees with this work. In a series of blog articles, we will give you an insight into the world of these strong and…

More