All articles
-
01 Oct. 2025 • 5 minutes
At the Bettembourg-Dudelange terminal, the train of tomorrow’s logistics is already on the right track
Read more -
18 Sep. 2025 • 5 minutes
A productive Summer of engineering works for the CFL, in service of their customers
Read more -
17 Sep. 2025 • 5 minutes
In Milbech, a Successful Lateral Shift and a Level Crossing Soon to Be Removed
Read more -
12 Sep. 2025 • 4 minutes
5 Tips to make back-to-school train travel safer
Read more -
05 Sep. 2025 • 4 minutes
Technology and expertise lay the tracks for the future
Read more -
28 Aug. 2025 • 3 minutes
Full Steam Ahead into the Past
Read more -
22 Aug. 2025 • 2 minutes
Towards the Decarbonization of the Terminal
Read more -
13 Aug. 2025 • 2 minutes
10 well-known (and some less so) facts about the CFL
Read more -
06 Aug. 2025 • 4 minutes
Summer on the move: CFL’s 1,100 daily bus challenge
Read more -
30 Jul. 2025 • 5 minutes
2.7 km track, 13 switches, 1 new platform… A productive summer for the CFL in Howald
Read more -
25 Jul. 2025 • 3 minutes
Welcome to the new P+R facilities in Troisvierges and Colmar-Berg
Read more -
18 Jul. 2025 • 1 minute
Key questions about the CFL works
Read more