The work carried out in summer 2023 on the North line marked the end of a vast programme to renew and modernise the track over a large part of this line, which was used last year by 5.8 million CFL customers. Over 78.6 km, the North Line (Luxembourg – Troisvierges – Gouvy) links the capital…
MoreIn order to proceed to the maintenance and modernization works on the North Line (Line 10), CFL relies regularly on the help of the so-called track-renewal-train. With its weight of 650 tons and a length of 177 meters, the steel colossus Swietelsky RU 800 S definitely catches everyone’s attention along the European rail networks. Besides…
MoreOf the 600 km of railway lines on the Luxembourg network, many sections run alongside rocky cuttings, particularly in the north of the country. To reduce the risks related to the structure and the potential instability of these rocky masses to the strict minimum, stabilisation and strengthening measures are regularly performed along the sections concerned….
MoreSince the last video in October 2016, constructions on-site have evolved a lot. Works on the lower and upper station were continued, the rails that will carry the four cabins of the funicular have been put into final position and are ready for use. In addition, the escalators connecting the train platforms of the future…
MoreFrom December 2017, Luxembourg will boast a new attraction: With the completion of the work on the innovative funicular railway, which will connect the Pfaffenthal and Kirchberg districts, a new profession will also be created, namely that of the funicular railway operator. We talked to Marc Wengler, General Director of CFL. So how do you…
MoreSince the beginning of the construction works on 4 May 2015, the evolution of the construction of the future Pfaffenthal-Kirchberg station and its funicular can be observed with the naked eye. The works are moving forward that quickly that the double-track rail traffic between Luxembourg and Dommeldange can be resumed no later than July 2nd…
MoreThrough the construction works of the new Pfaffenthal-Kirchberg stop and the new funicular under the “Red bridge”, CFL joins the ranks of those who are currently writing a new chapter in Luxembourg’s public transport sector. In order to complete this mammoth project, which will combine bus, tram and rail from December 2017 on, CFL has…
MoreSince 20 August 2016 modernization works on railway line nr. 10 are moving forward swiftly. During the three-week closure and after 40 years of loyal services, maintenance and modernization works are put into place between Schieren and Colmar-Berg. On this particular segment, the replacement of the rails and sleepers is completed by the renewal of…
MoreImportant construction works have taken place under the “Pont Grande-Duchesse Charlotte”, commonly known as “Red Bridge”… And works on the new “Pfaffenthal-Kirchberg” station which will equip Luxembourg City or, to be more precise, the districts Pfaffenthal and Kirchberg, with a new modern funicular, are well underway. During summer 2016, the freshly installed track underneath the…
More